Make a neat sketch of the symbol for a balancing device.

Eastern Cape DoE September 2025 2 marks (2) Civil services Term 3

About this question

Question 4.8.1 of Civil Technology Grade 12, NSC Preparatory Examination (Eastern Cape DoE, September 2025). It tests the Term 3 ATP topic Civil services.

  • TermTerm 3
  • ATP topicCivil services
  • PaperNSC September 2025 (Civil Services) (Eastern Cape)
  • Marks2 marks
Figure 4.7: Coupling
Pipe coupling
Answer
2 marks

Draw the standard plumbing symbol for a balancing device on the hot and cold water lines, with the device shown joined to both lines. Label it clearly.

Study this in your textbook: CAPS Annual Teaching Plan, Grade 12, Term 3: Consolidation and Preparatory Examination.

More Questions On Civil services

NSC September 2025 (Civil Services) (Eastern Cape) Civil services (1)
Answer

E.

It stops water being siphoned out of the cylinder when the cold supply is shut off.

Full answer and marking tips
NSC September 2025 (Civil Services) (Eastern Cape) Civil services (1)
  • A \(900\ \text{mm}\)
  • B \(1\,000\ \text{mm}\)
Answer

B: \(1\,000\ \text{mm}\).

The minimum distance is \(1\,000\ \text{mm}\).

Full answer and marking tips
NSC September 2025 (Civil Services) (Eastern Cape) Civil services (1)
Answer

False.

Drains carry sewage and waste; stormwater has its own system.

Full answer and marking tips
NSC September 2025 (Civil Services) (Eastern Cape) Civil services (1)
Answer

D.

It catches leaking water under the geyser.

Full answer and marking tips
NSC September 2025 (Civil Services) (Eastern Cape) Civil services (2)
Answer

The parts are:

  1. A is a boning rod.
  2. B is a sight rail.
Full answer and marking tips
NSC September 2025 (Civil Services) (Eastern Cape) Civil services (1)
Answer

To lead water away from the building and prevent erosion under the downpipe..